Rafa Goes Around visits Chongqing East Station, a 1.23-million-square-meter station with 15 platforms and 29 tracks. The pilot station-city project brings together seven high-speed lines, two conventional railways and four metro lines. Rafa sees its large halls, family and baby-care facilities and security layout, including ID checks at the boarding gate rather than the entrance, before racing to his train.
Next travel video:
More about the current video:()

A new station built into Chongqing's terrain
Rafa Goes Around tours Chongqing East Station, described as the world's largest railway station. The project covers 1.23 million square meters, roughly the area of 170 football fields. It is designed as a station-city integration pilot, bringing together seven high-speed railway lines, two conventional railways and four metro lines. The station has 15 platforms and 29 tracks, with a planned peak throughput of 16,000 passengers per hour.
Chongqing's mountainous terrain made the construction challenging. Rafa explains that earth had to be moved and leveled, and that mountains were cut to make room for the station. He sees the result as part of a trend toward bright, spacious transport hubs. The tour passes through the second-floor main hall and shows the station plan and the future commercial-hub vision.
Facilities, security and the rush to board
The station includes family facilities such as a baby-care room, along with clean toilets. Rafa sees local visitors and livestreamers documenting the opening day. He also describes the security process: four entrances on the north, south, east and west have metal detectors, and passengers pass through security. At this station, ID or passport checks take place at the boarding gate rather than at the entrance, which Rafa says is unusual compared with other Chinese stations.
The tour ends with Rafa hurrying through the enormous station to catch his train. Its scale makes the trip to the gate a challenge and illustrates why passengers need to account for the distance across the halls. The visit combines the building's scale, rail and metro connections, family amenities and security layout with the practical challenge of getting to the platform on time.
FAQs (From the traveler's perspective)
- Q: How long did construction take?
- A: Construction began in late 2018, and the station became fully operational in 2025. From the start of construction to full operation, the project took about six years.
- Q: What family facilities are there?
- A: The station has a dedicated baby-care room with clean spaces for changing and caring for children. Rafa points out the family facilities as part of the station's amenities, which he describes as uncommon in train stations.
- Q: How does the ID check work?
- A: Passengers pass through security at the entrance, then show their ID or passport at the boarding gate rather than at the entrance.